With all the rain we have had this week it has put a damper on the pool project. We do have half the pool deck power washed and the cover has been removed.
It looks like we might get a break in the rain this coming week so hopefully, we will be able to proceed with the rest of the power washing.
After power washing, we will proceed with the concrete repair and then on to the priming of the pool deck to get ready for the final finish coats. Stay tuned.